HARDLINEFIELD SERVICESHardline Field Services home

FIBER + LOW VOLTAGE CREWS · ALL 50 STATES

CREWS THAT SHOW UP.

We mobilize tooled, traveled and badge-ready fiber and low-voltage crews to hyperscale data center and FTTH builds in as little as seven days. One rate. One invoice. One point of contact.

7 DAYS

TYPICAL MOBILIZATION

21 / 7

STANDARD ROTATION

12 HR

SHIFTS, DAY OR NIGHT

50 STATES

COVERAGE, COAST TO COAST

Northern Virginia / AshburnDallas–Fort WorthPhoenix / MesaSilicon Valley / Santa ClaraHillsboro / PortlandColumbus / New AlbanyAtlantaChicago / Elk GroveSalt Lake CityReno / Storey CountyOmaha / Council BluffsSan Antonio / AustinNorthern Virginia / AshburnDallas–Fort WorthPhoenix / MesaSilicon Valley / Santa ClaraHillsboro / PortlandColumbus / New AlbanyAtlantaChicago / Elk GroveSalt Lake CityReno / Storey CountyOmaha / Council BluffsSan Antonio / Austin
Active data center markets: Northern Virginia / Ashburn, Dallas–Fort Worth, Phoenix / Mesa, Silicon Valley / Santa Clara, Hillsboro / Portland, Columbus / New Albany, Atlanta, Chicago / Elk Grove, Salt Lake City, Reno / Storey County, Omaha / Council Bluffs, San Antonio / Austin.

WHY WE EXIST

THE SCHEDULE DOESN'T MOVE. THE MANPOWER DOES.

Data center construction is not short of work — it is short of hands. A hyperscale fit-out can absorb sixty low-voltage technicians in a single phase, and the general contractor who wins that phase rarely has sixty of them sitting on the bench.

The usual fix is a scramble: a dozen independent 1099s sourced from three states, each with their own tooling gaps, their own no-show risk, and their own invoice. We replace that scramble with a crew — a foreman and his techs, already working together, priced as one line item.

WHAT WE DEPLOY

FIVE CREW TYPES, ONE LINE ITEM.

FUSION SPLICING
Single-mode and multimode, ribbon and single-fiber. Mass fusion for 12- and 24-fiber ribbon. OTDR testing, bi-directional certification, and closeout documentation delivered with the splice.
STRUCTURED CABLING
Cat6 and Cat6A, fiber trunks, MPO/MTP, cable tray, ladder rack and overhead pathway. Pulled, dressed, terminated, tested and labeled to TIA-942.
RACK AND STACK
Cabinet installation, hardware deployment, patching, cross-connects, labeling and as-builts. Crews that understand change control and work clean in live white space.
OUTSIDE PLANT
Aerial and underground, FTTH drops, splice enclosures, vault and handhole work. Crews that have done both the data hall and the street.
PUNCH AND QA/QC
Documentation, label audits, test-result verification and punch-list closeout when the build is done and the customer walkthrough is next week.

HOW AN ENGAGEMENT RUNS

TWENTY MINUTES TO SCOPE. SEVEN DAYS TO SITE.

01SCOPE
You send the scope, the site, the headcount and the start date. If drawings exist, we read them. A call takes twenty minutes.
02QUOTE
You get a written rate inside 24 hours: blended hourly or per-unit, with travel, per diem, lodging and tooling stated on the face of it. No discovery of costs later.
03MOBILIZE
We assemble the crew, complete background checks and site-specific safety orientation, submit badging paperwork, and put people on the plane. Seven days is typical. Faster has happened.
04RUN
The foreman reports to your superintendent, not to us. You get daily production numbers and one invoice at the end of the cycle.

GENERAL LIABILITY AND WORKERS' COMP ON FILE

OSHA 10/30 · NFPA 70E · ARC FLASH AWARENESS

BACKGROUND CHECKS AND DRUG SCREENING ON REQUEST

W-2 AND 1099 CREW STRUCTURES AVAILABLE

TELL US THE SCOPE. GET A RATE IN 24 HOURS.

No account manager. No discovery deck. Send the scope and the start date and we will tell you what a crew costs and when it lands.