FIBER + LOW VOLTAGE CREWS · ALL 50 STATES
CREWS THAT SHOW UP.
We mobilize tooled, traveled and badge-ready fiber and low-voltage crews to hyperscale data center and FTTH builds in as little as seven days. One rate. One invoice. One point of contact.
7 DAYS
TYPICAL MOBILIZATION
21 / 7
STANDARD ROTATION
12 HR
SHIFTS, DAY OR NIGHT
50 STATES
COVERAGE, COAST TO COAST
WHY WE EXIST
THE SCHEDULE DOESN'T MOVE. THE MANPOWER DOES.
Data center construction is not short of work — it is short of hands. A hyperscale fit-out can absorb sixty low-voltage technicians in a single phase, and the general contractor who wins that phase rarely has sixty of them sitting on the bench.
The usual fix is a scramble: a dozen independent 1099s sourced from three states, each with their own tooling gaps, their own no-show risk, and their own invoice. We replace that scramble with a crew — a foreman and his techs, already working together, priced as one line item.
WHAT WE DEPLOY
FIVE CREW TYPES, ONE LINE ITEM.
HOW AN ENGAGEMENT RUNS
TWENTY MINUTES TO SCOPE. SEVEN DAYS TO SITE.
GENERAL LIABILITY AND WORKERS' COMP ON FILE
OSHA 10/30 · NFPA 70E · ARC FLASH AWARENESS
BACKGROUND CHECKS AND DRUG SCREENING ON REQUEST
W-2 AND 1099 CREW STRUCTURES AVAILABLE
TELL US THE SCOPE. GET A RATE IN 24 HOURS.
No account manager. No discovery deck. Send the scope and the start date and we will tell you what a crew costs and when it lands.