FOR CONTRACTORS

HOW ENGAGEMENTS WORK

Commercial terms for systems integrators, electrical and low-voltage contractors, national cabling firms and data center general contractors.

PRICING

BLENDED HOURLY OR PER-UNIT

BLENDED HOURLY
One rate covering the foreman and the technicians on the crew. Used when scope is fluid, change orders are expected, or production units cannot be defined yet. Straight time and overtime multipliers are stated on the quote.
PER-UNIT
Fixed price per splice, per drop, per cabinet or per other measurable unit named in the scope. Used when drawings are stable and counts are reliable. Overruns bill at the stated unit rate unless a change order revises the count.
INCLUDED IN RATE
Travel to site, per diem, lodging and standard hand tools are included unless the quote scopes them separately. Fusion splicers, OTDRs and certification testers are supplied per project scope and itemized when they are dedicated to your job.
NOT INCLUDED
Specialty PPE beyond standard construction PPE, badging fees charged by the site owner, and materials such as cable, connectors, enclosures and hardware unless the quote says otherwise.

ROTATIONS AND SHIFTS

21 ON / 7 OFF. 12-HOUR SHIFTS.

STANDARD ROTATION
Twenty-one days on site, seven days off. Handoffs between rotations are staggered so production never drops to zero. Alternate rotations are quoted when the site requires them.
SHIFT STRUCTURE
Twelve-hour shifts, day or night. Dual-shift coverage is available where headcount and site access allow. State your shift preference in the first message so the quote reflects it.
FOREMAN
Every crew has a working foreman. He reports to your superintendent, owns the daily production numbers, and is the one phone call you make about the crew.

INSURANCE AND COMPLIANCE

CERTIFICATES BEFORE MOBILIZATION

INSURANCE
General liability and workers' compensation certificates are issued before crews mobilize. Additional insured and waiver of subrogation endorsements are provided where the contract requires them.
SAFETY TRAINING
OSHA 10 is the baseline. OSHA 30, NFPA 70E and arc-flash awareness are carried where scope and site rules require them. Site-specific orientation runs on your schedule.
SCREENING
Background checks and drug screening are completed to the standard the site owner sets. Screening lead time belongs in the mobilization window, so tell us early.
EMPLOYMENT STRUCTURE
W-2 and 1099 crew structures are both available. The structure is named on the quote so payroll and insurance treatment are settled before day one.

BADGING AND SITE ACCESS

BADGING IS USUALLY THE CRITICAL PATH.

WHO DOES WHAT
We complete the paperwork and submit packages to the site owner or your badging coordinator. You provide sponsorship, forms and portal access.
LEAD TIME
Travel takes a day. Badging can take two weeks. Give us the current lead time and the mobilization window we quote will hold.
ESCORTS AND ZONES
Live white space and MMR work follows your change control and escort rules. Crews do not improvise access.

FROM YOU

WHAT WE NEED TO START

Scope of work and headcount by trade

Site address and reporting contact

Drawings or cable schedules if they exist

Target start date and shift preference

Badging lead time and form package

Safety orientation schedule and PPE requirements

FROM US

WHAT YOU GET BACK

Written rate within 24 hours of a clear scope

Named foreman and crew roster before travel

Daily production reporting to your superintendent

Certificates of insurance before boots hit the site

Test results, as-builts and label schedules as scoped

One invoice per cycle

TELL US THE SCOPE. GET A RATE IN 24 HOURS.

No account manager. No discovery deck. Send the scope and the start date and we will tell you what a crew costs and when it lands.